Use the anti-loosening mounting screws on transmitter 2 to install the transmitter in the appropriate position inside the cover.
II. Installation on Measuring Cartridge
Remove the ceramic block from measuring cartridge 3.
Remove the screws from transmitter 2: first take out the anti-loosening sleeve from the screw hole, then remove the screw.
Insert a new mounting screw 1 into the transmitter's mounting hole from above.
Place the toothed lock washer 4 with its curved surface facing upward on the downwardly extending screw thread.
Connect the power cable to the transmitter according to the wiring diagram.
Place the transmitter into the junction box of the measuring cartridge and secure it.
Note: Before installing the transmitter on the measuring cartridge, remove the ceramic block from the measuring cartridge and the anti-loosening screws from the transmitter.
To install the transmitter on the measuring cartridge, toothed lock washers and corresponding mounting screws are required.
III. Installation on DIN Rail Bracket
(Note: Specific steps for DIN rail bracket installation are not provided in the original text; the above is a literal translation of the title. For standard DIN rail installation, refer to general industrial practices or the manufacturer's supplementary instructions.)
Wiring Method of TTH300 Temperature Transmitter
(Note: Specific wiring steps are not provided in the original text; retain the title as per the source content.)
Hardware Settings of TTH300 Temperature Transmitter
The transmitter is equipped with two DIP switches, which can be accessed via the hinged cover.
Switch 1: Enables hardware write protection.
Switch 2:
Supports hardware activation requirements for ITK simulation needed by FOUNDATION Fieldbus.
For HART7-supported transmitters, Switch 2 allows setting the required HART version (HART5 or HART7).
Important: Parameters cannot be modified via the local keys.